国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

World / Latin America

China, Mexico to partner on wind farms

By Mao Pengfei in Mexico City for China Daily (China Daily USA) Updated: 2016-05-09 10:04

A Chinese-Mexican partnership is set to invest some $200 million to build two wind farms, the first on a windswept stretch of the Gulf of Mexico.

Mexican energy developer Vive Energia and Chinese turbine manufacturer Envision Energy have joined forces to work on the green energy projects in Mexico's booming southeast Yucatan Peninsula, through their joint venture firm Renewable Energy of the Peninsula (Energia Renovable de la Peninsula).

The first wind farm is to be built, with an investment of $120 million, in Progreso, a Yucatan port on the Gulf of Mexico.

Its 36 120-meter-high wind turbines will churn out 90 megawatts (MW) of energy, with most of it (85 MW) to be sold to the state-run Federal Electricity Commission (CFE) and the remainder to the private sector.

"This project represents the largest investment ever by any Chinese company in Mexico's wind energy sector," said Rafael Valdez, Envision Energy's director for Latin America.

The project is one of 16 wind farms and solar plants that 11 firms from five different countries will be building in different parts of Mexico after winning the rights at a federal government auction held in late March, Mexico's daily Milenio reported at the time.

In this way, Mexico's CFE aims to boost electricity to the national grid through renewable energy sources.

"We are very pleased, because out of the many investments we have seen in Latin America by the Asian country ... most have been in the extractive sector, in natural resources projects," Valdez said.

In contrast, this project represents "capital, technology and infrastructure that comes to Mexico to stay", Valdez said.

In addition, he said, the project will generate clean energy that will promote productivity on the peninsula, create jobs and boost revenue.

Construction is expected to get underway in the second half of 2016 and be completed sometime next year, before the March 2018 deadline set by the government for starting operations.

Valdez said the joint venture firm is in talks with multinational development banks and financial institutions in the two countries to drum up financing for the project, the only one in the auction that proposed a hybrid scheme to supply energy to both the CFE and the private sector.

Envision Energy, China's third-largest producer of wind turbines and among the top 10 in the world, plans to bring the 36 turbines, each measuring 110 meters in diameter and capable of generating 2.5 MW of energy, over from China, while the steel towers they are mounted on will be made in Mexico.

Along with the wind farm in Progreso, the joint venture is set to begin building a second wind farm in 2016 in Dzilam de Bravo, a coastal town located just more than 80 kilometers east of Progreso.

This $80 million wind farm will have 70 MW in installed capacity via 28 2.5 MW wind turbines and supply energy to various companies on the peninsula, which is home to the states of Yucatan, Quintana Roo and Campeche.

The head of Viva Energia, Jose Antonio Aguilar, said the decision to build the plants in the Yucatan Peninsula was based on the growing demand for electricity in the region's cities and tourist resorts, among them Cancun and the Riviera Maya, on the Caribbean coast.

China, Mexico to partner on wind farms

(China Daily USA 05/09/2016 page2)

Trudeau visits Sina Weibo
May gets little gasp as EU extends deadline for sufficient progress in Brexit talks
Ethiopian FM urges strengthened Ethiopia-China ties
Yemen's ex-president Saleh, relatives killed by Houthis
Most Popular
Hot Topics

...
贵定县| 胶南市| 固始县| 屯昌县| 招远市| 东宁县| 阿坝| 子长县| 双牌县| 延吉市| 广平县| 米易县| 金坛市| 铜川市| 高密市| 青海省| 昭觉县| 方山县| 理塘县| 太谷县| 澄迈县| 阳泉市| 鹿邑县| 沙雅县| 桐城市| 九龙县| 台安县| 商水县| 陇西县| 呼玛县| 揭西县| 青铜峡市| 蒙城县| 万山特区| 五原县| 莒南县| 白朗县| 朝阳区| 松溪县| 渑池县| 云阳县|