国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

News >Bizchina

Jiuquan helps facilitate its 10-gW wind power base

2010-07-01 11:49

Jiuquan helps facilitate its 10-gW wind power base

Wind power turbine parts are seen at the production line of Gansu Glod Wind Power Equipment Manufacturing Co located at Gansu Jiuquan Industrial Park in Jiuquan, Gansu province on June 30, 2010. 

A reporting group of journalists from the country's nine newspapers, news agencies and magazines paid a visit to Gansu Jiuquan Industrial Park's Wind Electricity Equipment Manufacture Industrial Park on June 30, 2010, ahead of the 2010 China (Jiuquan) International New Energy Industry Fair, which is set to be held in the city of Jiuquan, Gansu province on July 7.

The media group visited enterprises manufacturing wind power equipment such as wind power turbines and blades, which are to be installed at Jiuquan's 10-gigawatts wind power base only 150 km away from the park.

Using the locally manufactured wind power equipment will greatly reduce the transportation costs, as the equipment used in Jiuquan came from Lianyungang city of Jiangsu province before the park was established in 2008.

"Transporting a single wind power blade from Lianyungang to Jiuquan will cost 100,000 yuan, but now the cost is only 20,000 yuan because it is produced here," said Yu Chengzhai, an official with the government of Suzhou district of Jiuquan.

The wind power equipment manufactured at the park will also be provided for the planned 10-gW level wind power bases in Hami in the Xinjiang Uygur autonomous region, western Inner Mongolia autonomous region and western Qinghai province, as all of them are within 600 kilometers from the park.

The establishment of a wind power equipment manufacturing park is in accordance with the country's target of reducing emissions and developing new energy, said Liu Yan, of the industrial park's regulation committee.

According to the National Development and Reform Commission's plan, Jiuquan's installed wind power capacity will reach 5.16 gW in 2010 and hit 12.71 gW by 2015.

Related News:

新巴尔虎左旗| SHOW| 深圳市| 称多县| 家居| 体育| 小金县| 开平市| 金湖县| 侯马市| 策勒县| 奉节县| 青阳县| 曲周县| 绵阳市| 泰顺县| 阿克苏市| 舟曲县| 荔浦县| 济阳县| 天镇县| 资中县| 阿鲁科尔沁旗| 阿拉善盟| 弥渡县| 德安县| 大理市| 休宁县| 罗平县| 平顺县| 醴陵市| 尖扎县| 漳州市| 西畴县| 保德县| 莱芜市| 米脂县| 左权县| 安吉县| 华容县| 马尔康县|