国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語Fran?ais
World
Home / World / Asia-Pacific

China-Laos railway completes both cross-Mekong River bridges' beam installation

Xinhua | Updated: 2020-07-16 14:45
Share
Share - WeChat
An aerial view of Laos-China Railway's T-beam installation in Laos on April 26, 2020. [Photo/Xinhua]

VIENTIANE - The Laos-China Railway Co Ltd (LCRC), a joint venture based in Lao capital Vientiane in charge of the construction and operation of the railway, told Xinhua on Thursday that, all its beams of the two cross-Mekong River bridges have been installed.

With the last 24-meter prestressed T-beam steadily settling down on the piers of the Ban Ladhan Mekong River Super Major Bridge, some 230 km north of Lao capital Vientiane last Friday, the task of beam setting on both cross-Mekong River super major bridges along the China-Laos Railway, undertaken by China Railway No 8 Engineering Group (CREC-8) has been successfully completed.

The China-Laos Railway crosses the Mekong River twice to the north of the ancient Lao capital of Luang Prabang, some 230 km north of capital Vientiane.

The continuous beam of the Luang Prabang bridge was closed on July 28, 2019, while its T-beam installation was completed on April 23, 2020, and the Bang Ladhan Mekong bridge closed its continuous beam on April 1.

The Ban Ladhan Bridge, with 1,652 meters in length, has 45 spans connecting two platforms and 44 piers. All the main piers, with the highest up to 57.5 meters, are located in the middle of the Mekong River along the China-Laos Railway.

According to Zhang Jiahong, a project manager with CREC-8, the Ban Ladhan Bridge, with the highest pier and the longest span on China-Laos Railway, posed a great challenge to construction with high safety risks.

Zhang told Xinhua on Thursday that his team has overcome the hot weather, rainy season's thunderstorms and strong wind to do their job.

In order to ensure the high standard, high quality and high efficiency of construction, the project department has strictly implemented the construction requirements and COVID-19 precaution measures, said the Chinese engineer.

The China-Laos Railway is a strategic docking project between the China-proposed Belt and Road Initiative and Laos' strategy to convert from a landlocked country to a land-linked hub.

The over 400-km railway, with 198-km tunnels and 62-km bridges, will run from Boten border gate in northern Laos, bordering China, to Vientiane with an operating speed of 160 km per hour.

Most Viewed in 24 Hours
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
瓦房店市| 泽普县| 蒲江县| 大渡口区| 九寨沟县| 南漳县| 上饶县| 静安区| 台东市| 蒙山县| 德州市| 河曲县| 惠水县| 福鼎市| 澎湖县| 望城县| 曲阳县| 来宾市| 图们市| 五家渠市| 南召县| 孟村| 苍山县| 山阳县| 嘉善县| 安宁市| 乌兰察布市| 福州市| 天峻县| 闸北区| 武冈市| 府谷县| 四子王旗| 兴宁市| 宁夏| 阿拉善左旗| 会泽县| 澜沧| 上虞市| 阳西县| 湟源县|