国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 
 
Home> News

Freight rail tunnel breaks through early

( China Daily )

Updated: 2018-05-28

Freight rail tunnel breaks through early

Welders work on supporting structures inside the Dazhongshan Tunnel earlier this month in Sanmenxia, Henan province. [Photo by China Daily]

Workers on Sunday morning completed the digging of a tunnel for the world's longest heavy-freight railway-which will stretch from coal-rich northern China to the country's central provinces-five months ahead of schedule, the project contractor said.

The 14.5-kilometer Dazhongshan Tunnel is being built in Sanmenxia, Henan province, by Shanghai Civil Engineering Co, a subsidiary of China Railway Engineering Corp.

It is an essential part of the Inner Mongolia-Jiangxi Railway coal freight project, which is 1,837 km long and expected to carry about 200 million metric tons a year from the Inner Mongolia autonomous region and Shaanxi and Gansu provinces to central China, including Hubei, Hunan and Jiangxi provinces.

Construction of the railway began in 2015, with total investment expected to reach about 190 billion yuan ($29.7 billion). It will run through seven provinces and regions, with work scheduled to be completed in October next year.

The railway will help optimize the country's distribution of energy resources. Coal resources in the north can be used to provide energy for the provinces of central China, said Zhang Guijun, the project's manager.

"With its economic value and standardized construction, the railway will be a new brand of Chinese railway after it goes into operation," he said.

Zhang Lin, chief engineer for the Dazhongshan Tunnel project, said building the railway is a massive challenge, as the route crosses the Yellow River twice, as well as the Yangtze River and complex mountain ranges.

The tunnel is in Sanmenxia's mountainous Lushi county.

"Most of it is 80 to 500 meters from the surface. The deepest point is 710 meters," Zhang said. "Digging the tunnel has been hard and risky."

He said workers came across 12 geological faults, endured temperatures of up to 50 C and experienced water bursts, but no one died because of the project's high degree of mechanization and careful planning.

Zhang said the team had also worked hard to protect the environment. Lushi county is an important water resource for the middle line of the South-North Water Diversion Project.

Wang Zhibing, another chief engineer, said the company processed more than 400,000 cubic meters of excavated rock and used it in construction.

The team also tried to help poverty-stricken local families by drilling several water wells and hiring local residents to work on the project, he added.

Copyright ? 2013 China Daily
All Rights Reserved
Sponsored by Sanmenxia Municipal Government
Powered by China Daily

开封市| 丰原市| 甘孜| 永寿县| 理塘县| 颍上县| 抚顺县| 景洪市| 浦城县| 本溪| 九龙坡区| 淮安市| 兰州市| 星子县| 长武县| 九江市| 三穗县| 黄浦区| 仲巴县| 三门县| 屏山县| 汾阳市| 平原县| 富宁县| 大同县| 蓬莱市| 雷山县| 河西区| 句容市| 新宁县| 玛纳斯县| 奉新县| 万盛区| 且末县| 满洲里市| 郑州市| 兴仁县| 苗栗市| 东光县| 铜山县| 闽清县|