国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Economy and Business

Nuclear power project starts

By Zhao Ruixue (China Daily Shandong Bureau)
Updated: 2009-12-29 16:00
Large Medium Small

The first phase of building two giant reactors for a new nuclear project that will cut carbon emissions and boost the local economy started December 28.

Two 1250 mW reactors will be built in the first phase, at the site in Haiyang, east China's Shandong province, and are scheduled to be put into use in May 2014 and March 2015 respectively.

Related readings:
Nuclear power project starts China's nuclear power giants ink $776M contract
Nuclear power project starts Nuclear power plants set to go inland
Nuclear power project starts Construction of Taishan nuclear power plant begins

The entire nuclear project will have eight reactors with a total capacity of 10000 mW.

All of the reactors will use the third-generation AP1000 technology developed by the US-based Westinghouse Co.

Shandong Nuclear Power under the China Power Investment Corporation is in full charge of the project's design, construction, operation and management.

Annual power output is expected to reach 17.5 billion kw when the first two reactors are completed, easing Shandong's power tension and optimizing the province's power structure.

In addition, the large amount of investment on the nuclear project will promote the local economy and drive domestic demand to grow.

When completed, the eight reactors will cut carbon emission by at least 50 million tons, nitrogen oxides by 150,000 tons and dust emission by 120,000 tons annually, compared with the same-scale coal steam-electric plants.

宜昌市| 临湘市| 长顺县| 务川| 达尔| 新津县| 常宁市| 东台市| 常熟市| 同德县| 兴业县| 兰溪市| 望都县| 陇川县| 汝南县| 乌拉特中旗| 垦利县| 江华| 邻水| 赤峰市| 威信县| 吴江市| 祁连县| 英山县| 阿合奇县| 溆浦县| 河北区| 南充市| 汾西县| 保靖县| 富川| 镇江市| 洞口县| 伊吾县| 四平市| 公安县| 堆龙德庆县| 东至县| 德庆县| 黄平县| 民乐县|