国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Home|Contact|Members|中文|
Search
Home > Transmission and Distribution

Overseas Business

T&D Construction

Updated: 2020-09-09

POWERCHINA has done power transmission and transformation engineering work on various voltages -- 110 kV, 220 kV, 330 kV, 500 kV, 660 kV, 750 kV, 800 kV, 1,000 kV -- and has the equipment for power transmission and transformation engineering work at various voltages, as well as an international traction machine and tensioner.

By the end of 2014, it had completed work on 13,000 km of power transmission lines at or above 110 kV, and had 8,000 km of lines of 220 kV or higher, 5,000 km of lines at?or above 500 kV, and?750 km of?750 kV or higher. It had completed?six transformer substations and convertor stations at?750 kV or higher, 70 at?500 kV or higher, and 300 at?220 kV or higher

T&D Construction

Sichuan-Tibet Power Interconnection Engineering Project is the most difficult project in the construction of power transmission and transformer system, with a total length of over 1,500 kilometers. [Photo/POWERCHINA]

T&D Construction

The Belo Monte Power Transmission Project in Brazil is the first ±800 kV high voltage direct current electric transmission line in Latin America and the fourth of its kind in the world. [Photo/POWERCHINA]

富源县| 吴江市| 蚌埠市| 巢湖市| 泰和县| 珲春市| 梅河口市| 尚志市| 昌黎县| 时尚| 宁河县| 元阳县| 揭阳市| 海盐县| 油尖旺区| 库尔勒市| 凌云县| 集安市| 武功县| 宜城市| 崇文区| 娄底市| 乌拉特后旗| 易门县| 乐平市| 正宁县| 泗阳县| 德钦县| 安福县| 永善县| 托克托县| 溆浦县| 裕民县| 绥滨县| 阳江市| 南开区| 扬州市| 阳朔县| 轮台县| 镶黄旗| 金门县|