国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Home|Contact|Members|中文|
Search
Home > Transmission and Distribution

Overseas Business

T&D Planning, Investigation, Design and Consultation

Updated: 2013-06-25

2) UHV converter station design

T&D Planning, Investigation, Design and Consultation

Areial view of±800-kV UHV Xiluodu (Shuanglong) converter station

T&D Planning, Investigation, Design and Consultation

±500-kV Deyang converter station, Sichuan province, put into operation in 2009.

3) UHV substation design

T&D Planning, Investigation, Design and Consultation

 

The Jindongnan- Nanyang- Jingmen 1,000-kV UHVAC transmission line is China's first transmission project of its kind, with a total length of 654 km and a 3.65-km span across the Yellow River and 2.96 km across the Hanjiang. It went into service in 2009 and won the National Quality Engineering Gold Medal the same year.

4) UHV substation design

T&D Planning, Investigation, Design and Consultation

The Xiangjiaba – Shanghai ±800-kV UHVDC transmission pilot project was China's first UHVDC transmission project and currently carries the highest DC voltage and is the most advanced DC transmission project in the world. The line is 1,891.6 km long and crosses the Yangtze River four times. It has a conversion capacity of 6,400 MW at 4,000 A DC. It went into operation in 2010 and won the National Quality Engineering Gold Medal for 2011.

Previous Page 1 2 Next Page

镶黄旗| 景东| 班玛县| 奇台县| 康定县| 鄄城县| 曲沃县| 阜城县| 大理市| 高青县| 凌海市| 长武县| 郧西县| 慈溪市| 城固县| 当阳市| 体育| 潮安县| 如皋市| 甘肃省| 松阳县| 台东县| 赣州市| 恭城| 社旗县| 奎屯市| 丰城市| 云南省| 卢湾区| 南溪县| 鄂尔多斯市| 扎兰屯市| 施甸县| 健康| 广德县| 揭阳市| 玛纳斯县| 临江市| 宜黄县| 汕尾市| 曲靖市|