Home / Our Business / Equipment Installation

Equipment Installation

CGGC is capable of installing turbo-generator units, electrical and auxiliary equipment of four 1,000MW hydropower projects simultaneously and its business covers various types of turbines such as Francis, axial-flow, pumped storage, tubular, and Pelton.

In the Three Gorges Project, CGGC created a world record of installing and putting into operation four large units (700MW each) within one year; in recent years, CGGC has installed over 50% of China’s total hydropower capacity, and is the established leader in hydropower unit installation in China and even the world.

 

Electromechanical Equipment Installation in the Three Gorges Water Conservancy Project (China)

In the Three Gorges Project, CGGC installed and put into operation four units (700MW each) within just one year, creating a world record.

Read more

 

Electromechanical Equipment Installation in the Gezhouba Water Conservancy Project (China)

In the installation of Gezhouba Water Conservancy Project, CGGC created national records in three aspects: annual installed capacity, annual installed number of units and installation progress, and was thus awarded the National Science & Technology Progress Prize.

Read more

 

Installation and Completion of a Double-way Five-stage Ship Lock in the Three Gorges Project (China)

In the Three Gorges Project, CGGC was responsible for installing all the metal structures and electromechanical equipment used for the permanent ship lock, which is of the largest scale, the most complex technology and the biggest difficulty in the world.

Read more

 

Electromechanical Equipment Installation at the Xiluodu Hydropower Station (China)

With a total installed capacity of 13860MW, the Xiluodu Hydropower station is currently China's second largest and the world's third largest hydropower station.

Read more

 

Electromechanical Equipment Installation at the Shuibuya Hydropower Station (China)

CGGC installed and commissioned all the four 460MW water-turbine generator units in the underground powerhouse, the utility systems, and the water inlet and spillway metal structures of the Shuibuya Hydropower Station.

Read more

 

Electromechanical Equipment Installation at the Geheyan Hydropower Station (China)

CGGC is the prime contractor for the four generator units at the Geheyan Hydropower Station, each having a single-unit capacity of 300MW.

Read more

 

Electromechanical Equipment Installation at the Longtan Hydropower Station (China)

CGGC was responsible for installing three homemade units (Nos. 5, 6 and 7 units) in the first phase of Longtan Hydropower Station Project.

Read more

 

Electromechanical Equipment Installation at the Pubugou Hydropower Station (China)

For the Pubugou Hydropower station, CGGC installed two of the six units and the entire utility system.

Read more

 


   Previous 1   

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

宝应县| 比如县| 天津市| 葫芦岛市| 大冶市| 文昌市| 清新县| 北海市| 剑阁县| 电白县| 襄城县| 婺源县| 通河县| 崇礼县| 台北县| 安宁市| 德保县| 惠安县| 突泉县| 疏勒县| 丽江市| 海丰县| 尤溪县| 应用必备| 丹巴县| 宜都市| 太仆寺旗| 星座| 沙坪坝区| 象山县| 天祝| 云梦县| 浮山县| 泸州市| 二连浩特市| 呼玛县| 泸西县| 翁牛特旗| 安多县| 汾西县| 淅川县|