国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

CGGC-undertaken Cambodian Lower Stung Russei Chrum Hydropower Station begins to impound water

Updated: 2014-01-02

On December 13, CGGC-undertaken Cambodian Lower Stung Russei Chrum Hydropower Station began officially to impound water.

As one of the largest hydropower stations in Cambodia, Lower Stung Russei Chrum Hydropower Station is located at Koh Kong Province of the Kingdom of Cambodia. The dam project consists of upper hydropower station and lower hydropower station. The upper hydropower station dam is a concrete-face rockfill dam with the maximum height of about 124m and installed capacity of 206MW. It was put into operation on schedule in June 2013. The lower hydropower station dam is a roller-compacted concrete gravity dam with the maximum height of 58.5MW and installed capacity of 132MW. The total installed capacity of the upper hydropower station dam and lower hydropower station dam is 338MW.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

松溪县| 镇远县| 宜兰县| 彩票| 台南县| 信丰县| 乌拉特中旗| 浮梁县| 晋州市| 志丹县| 贵溪市| 长治市| 江安县| 本溪市| 共和县| 龙海市| 肥乡县| 五莲县| 昔阳县| 开封县| 浪卡子县| 平和县| 洱源县| 太原市| 安岳县| 晋州市| 丰城市| 桑日县| 白城市| 北海市| 乡宁县| 随州市| 商洛市| 西城区| 平和县| 雅安市| 哈尔滨市| 宁乡县| 青神县| 长寿区| 子洲县|