国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

CGGC-undertaken Nigerian Road Network Reconstruction Project completed

Updated: 2013-12-31

On December 10, CGGC-undertaken Nigerian road network reconstruction project in Lagos completed.

The project was started in March 2013 to renovate the 16 streets that have a total length of 10.39km and water supply and drainage pipelines in Mushin of Lagos.

In the past, all of the 16 streets in Mushin are earth roads, of which many sections are dilapidated and tend to be waterlogged, causing frequent traffic accidents. The completion of the project greatly improves local environment and transportation.

Many local residents dressed up for the handover ceremony held on December 10 to celebrate the completion of the project.

CGGC has successfully completed over 30 large-scale projects in foreign countries, including Ethiopian Tekeze Hydropower Station, Pakistani Neelum-Jeelum Hydropower Station, Cambodian Takemu Water Tower Project and Iranian Mollasadra Hydropower Station.

 

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

朝阳区| 海门市| 介休市| 文昌市| 达日县| 丰台区| 黄大仙区| 虎林市| 图片| 绥阳县| 东莞市| 盱眙县| 那曲县| 漳平市| 天水市| 老河口市| 双城市| 台安县| 新闻| 和政县| 大田县| 于田县| 濮阳市| 灵寿县| 林州市| 马关县| 逊克县| 长寿区| 张北县| 兴国县| 南江县| 通榆县| 广东省| 育儿| 永定县| 隆昌县| 隆化县| 当涂县| 南宁市| 白水县| 新闻|