国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

Contract signed by CGGC for Hydropower Stations on the Santa Cruz River in Argentina

Updated: 2013-11-15

In El Calafate, Santa Cruz province, Argentina on Oct 31, CGGC officially signed a contract with the country’s Department of Federal Planning, Public Investment and Services for the Finance, Design, Construction and 15-year operation & maintenance of President Nestor Kirchner Hydropower Station and Governor Jorge Saipan Nick Hydropower Station on the Santa Cruz River.

The project's total installed capacity is 1.74 million kilowatts, where six Francis turbines will be installed for the President Power Station to reach a generating capacity of 1.14 million kilowatts and five axial-flow hydraulic turbines will be installed for the Governor Power Station to achieve a generating capacity of 600,000 kilowatts.

When completed in 66 months, the project, as one of the country's national key projects, will not only be able to provide strong power for Argentina's economic and social development but also enable her to export electricity to neighboring countries that are suffering from power shortage. So far, it is the largest overseas project ever undertaken by Chinese companies, exceeding the NJ Project in Pakistan in terms of construction scale.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

门头沟区| 南雄市| 浮山县| 林口县| 武乡县| 洛南县| 全州县| 长春市| 敦煌市| 驻马店市| 东平县| 尤溪县| 武强县| 丹寨县| 红河县| 安福县| 湟中县| 夏津县| 灵寿县| 麻城市| 博客| 十堰市| 阿拉善盟| 龙陵县| 和龙市| 蒲城县| 二连浩特市| 二手房| 张家港市| 西畴县| 临漳县| 济南市| 普格县| 怀来县| 蓬莱市| 雷波县| 民丰县| 鄂托克前旗| 青川县| 旬邑县| 新晃|