国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

CGGC wins the project of Wudongde spillway tunnel

Updated: 2013-10-07

On Sep 29, CGGC won the construction project of section I of the civil construction and installation of metal structure of the spillway tunnel of Wudongde Hydropower Station.

The project, with the construction of the spillway tunnel and the tailrace as the key, will start from October 2013 to June 30, 2019, lasting a total of 69 months.

Located at the Wudongde Hydropower Station on the border between Luquan County (Kunming City, Yunnan Province) and Huidong County of Sichuan Province, it is the first one of the four cascades at the lower reach of the Jinsha River.

The power station has a total installed capacity of 10.2 gigawatts and is expected to be put into operation in 2020. Upon completion, the project will play a role in power generation, flood control, shipping and sediment storage, etc., and is of strategic importance to the economic & social development of Sichuan and Yunnan and the project of “West-East Power Transmission”.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

山丹县| 平谷区| 静宁县| 富川| 浦北县| 东山县| 行唐县| 加查县| 莱西市| 佛教| 花垣县| 阳曲县| 德江县| 扎鲁特旗| 正宁县| 九江市| 永寿县| 响水县| 墨竹工卡县| 洪雅县| 广平县| 庆云县| 嘉峪关市| 惠安县| 平果县| 稷山县| 桓台县| 纳雍县| 松桃| 合肥市| 凤山县| 麻阳| 江阴市| 聊城市| 巴中市| 宁强县| 香港| 永清县| 三明市| 定陶县| 兴宁市|