国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

CEEC: No.2 steam turbine of Sasan Ultra Mega Power Station boxed up

Updated: 2013-08-06

On Aug 3 (local time), the box-up work of No.2 steam turbine of 6*660,000-kilowatt Sasan Ultra Mega, which was undertaken by CEEC, was successfully completed, indicating the unit has entered the commissioning phase in an all-around way.

Before the box-up work, the general contractor organized experts to inspected the No.2 unit and accepted the steam turbine and relevant materials. In the process of inspection, the experts made a sample check on the bed-plate gap of the steam turbine, elevation of rotor and steam cylinder, gap of sliding pin, center of rotor coupling, flow path clearance and bearing bush clearance, etc., and all of the measured results comply with the design requirements of the drawings and are considered excellent.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

南阳市| 二手房| 奈曼旗| 调兵山市| 乐平市| 龙井市| 九台市| 龙江县| 高尔夫| 盐池县| 会理县| 广宁县| 萝北县| 连南| 苍梧县| 蒙城县| 搜索| 比如县| 遂平县| 吕梁市| 重庆市| 肇源县| 鄯善县| 信丰县| 彩票| 宁陵县| 科技| 西峡县| 于田县| 东平县| 合阳县| 松江区| 南澳县| 库车县| 仙游县| 达州市| 木里| 卢湾区| 宣恩县| 合作市| 怀柔区|