国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

Tatay Hydropower Station prepared for power generation in Cambodia

Updated: 2013-07-29

The hydropower station in Tatay River, the largest water conservancy project undertaken by CGGC in Cambodia has entered critical construction phase.

The project department has refined the power generation procedure by developing a scientific construction plan and making careful construction arrangements to get fully prepared for power generation.

Up to now, the upward water tunnel was completed in early this year and the downward tunnel has finished 6,941 meters; the 4th tunnel has completed 696 meters of concrete floors on the upstream and downstream sides; the 6th tunnel intersection was half-finished, and 80 percent of the steel penstocks have been assembled and welded.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

福泉市| 昌平区| 朔州市| 东乡县| 潍坊市| 乐安县| 沛县| 新巴尔虎左旗| 芦山县| 方城县| 鄂托克旗| 乌海市| 尼木县| 恩平市| 宝应县| 吴桥县| 福泉市| 海门市| 龙泉市| 云霄县| 祁门县| 浑源县| 万盛区| 大宁县| 偃师市| 伊吾县| 五河县| 陆川县| 南涧| 桐城市| 荔浦县| 甘孜| 彭泽县| 九龙坡区| 龙海市| 昭通市| 辽宁省| 即墨市| 金沙县| 玉田县| 莱西市|