国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

CGGC and South Sudan sign a contract for the Biden Hydropower Station Project

Updated: 2012-02-02

On Jan 20, CGGC and the Ministry of Electricity and Dams of South Sudan signed a contract in Beijing for the Biden Hydropower Station Project.

Representatives from the Ministry of Electricity and Dams of South Sudan, South Sudan Power Corporation and CGGC participated in the signing ceremony.

CGGC and South Sudan sign a contract for the Biden Hydropower Station Project

The Biden Hydropower Station is located on River Bahr al-Jabal, a section of the Nile River between Nimule and Juba, Equatorial State, South Sudan, 30 kilometers away from Juba, the country’s capital.

With a total installed capacity of 540 MW, the project, in the form of an EPC turn-key contract, includes construction of power houses, diversion dam blocks, concrete spillway dams, dam blocks with concrete bottom and outlets, non-spillway dam blocks and concrete faced rock-fill dams. With a construction period of 80 months, the project is expected to fundamentally remove the power supply bottleneck in South Sudan after completion.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

镇沅| 邻水| 和政县| 汽车| 崇州市| 玉山县| 库伦旗| 祁连县| 洞口县| 宁河县| 万州区| 新绛县| 若尔盖县| 肥东县| 吉木乃县| 登封市| 循化| 峡江县| 民勤县| 汪清县| 四会市| 阜平县| 龙游县| 赤水市| 西乌| 宁国市| 仁寿县| 罗城| 宣城市| 珠海市| 平利县| 涞水县| 沭阳县| 合山市| 合作市| 邯郸市| 乌拉特前旗| 郁南县| 旺苍县| 卓尼县| 甘泉县|