国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

First main bridge continuous beam of Bamako No 3 Bridge in Mali shuts ahead of time

Updated: 2010-05-15

Grouting recently finished at the shutting section of the middle span of the prestressed concrete continuous beam between 57# Pier and 58# Pier of the Bamako No 3 Bridge in Mali contracted by CGGC came eight days ahead of the schedule.

This is the first main bridge continuous beam that has been successfully shut since the commencement of the bridge project one year ago. It lays the foundation for the half-width penetration of the bridge at the end of this September, and also marks the important periodical victory of the construction of the bridge project.

The bridge lies in the eastern part of the city proper of Bamako, the capital of the Republic of Mali in Africa and spans the Niger River. It is the biggest economic aid project of the Chinese Government to the West Africa. The bridge covers a total length of 1,626 meters with 69 spans, and the layout of the entire bridge consists of the prestressed concrete T beam, the prestressed concrete hollow core slab, and three 3-span prestressed concrete continuous beam bridges with the length of 122 meters each. The prestressed concrete continuous beam bridge adopts the box girder structure and the balanced grouting construction with the hanging basket and the cantilever, which belong to the key and difficulty of the bridge construction.

Since the construction of the continuous box girder in November, 2009, the Mali Bamako No 3 Bridge Technical Construction Group of CGGC No 2 Engineering Co. has purchased relevant materials and equipment from China and delivered them to the site in advance, and built the three 3-span 122 meters prestressed concrete continuous beam bridges at the same time, thereby ensuring the construction progress of every part.

The shutting sections of the middle spans of the other two main bridges will finish construction before mid-July to ensure the smooth fulfillment of the objective to open the half width on the upstream of the bridge before the 50th anniversary for the founding of the Republic of Mali on Sep 22.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

新宁县| 舒兰市| 扎赉特旗| 岑溪市| 咸丰县| 郯城县| 海宁市| 河间市| 左贡县| 望城县| 繁峙县| 同德县| 揭西县| 彰武县| 定日县| 缙云县| 哈密市| 宁都县| 靖远县| 庐江县| 潞西市| 辉县市| 图木舒克市| 吕梁市| 灌阳县| 布尔津县| 策勒县| 大庆市| 辰溪县| 伊宁市| 无为县| 恩施市| 建水县| 印江| 泰州市| 陆川县| 麦盖提县| 嘉荫县| 樟树市| 四会市| 云龙县|