国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
 

Home/News

Construction progress of Malian Bridge Project commended by client

Updated: 2009-10-25

On Oct 22, 2009 local time, Ahmed Diane Semega, the Malian Minister of Equipment and Transportation, commended the rapid progress of Bamako No 3 Bridge in the recent time when heading a group to visit the construction site.

At about 11:00 am, the group first arrived at the construction site of the south bank prefabrication plant for the bridge project, understood the steel bar structures of hollow plate girders and T girders, watched the tension process of the hollow plate girders on the site, and asked the technical team in detail about the preparation of staff, equipment and materials.

Seeing piles had risen from the ground, prefabricated girders had been piled in large quantities on both banks, and the construction of the roadbed refilling section on both ends of the bridge was going on stressfully, Mr Semega was very glad. He sincerely appreciated the hard work of the CGGC construction staff, and hoped that they would continue the effort to finish half of the bridge prior to the National Day of Mali in September, 2010 and deliver the entire project on schedule.

The head of the Malian technical team of CGGC vowed that all the staff of the technical team would elaborately organize the construction and carry out the scientific construction to ensure all objectives of different stages were accomplished on schedule.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.

黎川县| 朔州市| 宜章县| 武功县| 名山县| 大余县| 绥中县| 潼关县| 汨罗市| 濉溪县| 固安县| 邻水| 鹰潭市| 保定市| 象州县| 普兰店市| 佛学| 湄潭县| 密山市| 永仁县| 舒城县| 于田县| 樟树市| 贡觉县| 安溪县| 定日县| 交口县| 义马市| 平罗县| 安庆市| 峨眉山市| 沛县| 梅州市| 舟曲县| 天台县| 夏邑县| 昆明市| 保定市| 安达市| 德州市| 宝丰县|