国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Your’re Here : Home > News

CGGC-undertaken Namibia Northern Highway Project handed over and put into Service

Updated: 2016-03-02

On 26th February, the Namibia Northern Highway Upgrading Project undertaken by CGGC was handed over and put into operation. Hage Geingob, President of Namibia, cut the ribbon on the open-to-traffic ceremony of the Highway.

The Contract of the Namibia Northern Highway Upgrading Project was signed on 14th March, 2012 and officially put into effect on 8th April, 2013. According to the Contract, CGGC was assigned to upgrade the original D3608 Highway into a bituminous concrete highway in the length of 98.25km in total. The east-west highway is located in the north of Namibia across Aomushadi and Ohangwena, about 20km far from the border of Angola against Namibia.

On 15th May, 2013, Pohamba, current President of Namibia, attended the opening ceremony. There were 67 local people recruited for the project whose general contract amount USD 80 million was 100% provided by the Export-Import Bank of China on concessional loan for the whole construction period of 36 months.

> Links> Contact Us
Tel :+86-10-59525952 Fax : +86-10-59525951
Address: Tower F, Ocean International Center, 208 Ciyunsi Beili, Chaoyang District, Beijing (100025), P.R. China
Copyright ? 2013 China Gezhouba (Group) Corporation. All rights reserved.
徐水县| 溧阳市| 宁海县| 永泰县| 广丰县| 奈曼旗| 宁陕县| 花垣县| 林口县| 泽库县| 丹江口市| 绍兴县| 尼勒克县| 防城港市| 临安市| 青河县| 临清市| 吉林省| 江安县| 龙江县| 丽江市| 辉南县| 广安市| 库伦旗| 遂平县| 皮山县| 芜湖县| 万源市| 平谷区| 滁州市| 嘉峪关市| 柳河县| 广水市| 岐山县| 鄂尔多斯市| 长海县| 沙坪坝区| 视频| 含山县| 盐边县| 潞西市|