国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Your’re Here : Home > News

Yang Yisheng calls on Minister of Energy and Mineral of Uganda and Chinese Ambassador to Uganda

Updated: 2015-08-28

On 19 and 20 August, 2015, Yang Yisheng, Deputy Chief Economist and International Business Director of CGGC and Vice General Manager of CGGC International, successively paid calls on Irene Muloni, Minister of Energy and Mineral of Uganda, and Zhao Yali, Ambassador of China to Uganda.

Yang Yisheng calls on Minister of Energy and Mineral of Uganda and Chinese Ambassador to Uganda

Yang Yisheng called on Minister of Energy and Mineral of Uganda

Yang Yisheng briefly introduced the current status of CGGC’s market development in Africa, management of projects under construction and representative projects to both of them. He also reported the progress of Ayago Hydropower Project in Uganda in detail, and expressed gratitude to them for their energetic support and help for CGGC’s development in Uganda. Yang Yisheng said that CGGC will complete the preparatory work of Ayago Hydropower Project to put it into effect and bring benefits to Ugandan people as soon as possible.

The Minister of Energy and Mineral was very grateful to CGGC for its mountains of preparatory work to promoting Ayago Hydropower Project into service. She hoped that, by undertaking Ayago Project, CGGC would further participate in social and economic development of Uganda and bring more benefits to the local people. She said that the Ugandan government would continue giving full support to the development of CGGC in Uganda. The two sides reached a number of important consensuses on next working steps.

Yang Yisheng calls on Minister of Energy and Mineral of Uganda and Chinese Ambassador to Uganda

Yang Yisheng called on Ambassador of China to Uganda

Ambassador Zhao Yali extended warm welcome to Yang Yisheng and his group. He pointed out that the construction of Ayago Hydropower Station in Uganda by CGGC was supported and recognized by the two Governments and relevant departments in the form of MOU, hoping that CGGC will work with the owner to accelerate the effectiveness and commencement of the project. Zhao also analyzed the political and economic situation in Uganda, proposed a number of recommendations on risk management and control against the Ugandan presidential election, expected petroleum revenues and other matters, and expressed that he would continue supporting the development of CGGC in Uganda.

The above meeting was attended by Mr. Yao Minghui, President of CGGC Three Gorges Construction Engineering Co. Ltd, and Mr. Lyu Zexiang and Mr. Yuan Baoyi, Vice Presidents of CGGC International. On August 20, Lyu met with the Uganda Minister of Transport, communicating about road, airport, port and other projects that CGGC were following up in Uganda.

 

> Links> Contact Us
Tel :+86-10-59525952 Fax : +86-10-59525951
Address: Tower F, Ocean International Center, 208 Ciyunsi Beili, Chaoyang District, Beijing (100025), P.R. China
Copyright ? 2013 China Gezhouba (Group) Corporation. All rights reserved.
新营市| 望谟县| 桂林市| 阳东县| 栖霞市| 巨鹿县| 罗平县| 鹰潭市| 基隆市| 罗山县| 安新县| 涟源市| 馆陶县| 建始县| 房产| 郁南县| 太仆寺旗| 景洪市| 北宁市| 红原县| 肃北| 栾川县| 区。| 会理县| 锡林浩特市| 新巴尔虎左旗| 连南| 南城县| 蒙山县| 玉屏| 浦江县| 常宁市| 丽江市| 唐山市| 溧阳市| 无棣县| 弥勒县| 清水县| 车险| 开鲁县| 东海县|