国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

 
Home> Business

Caisson installation at Pingtan wharf

( chinadaily.com.cn )

Updated: 2013-06-14

  Print Mail Large Medium  Small 0

Caisson installation at Pingtan wharf

The final caisson went into the sea at Jidiao wharf, in Jinjing Bay, on the western part of Pingtan Island, Fujian province, on June 10, marking the beginning of a new phase in construction work on berths No 2 and 3.

A total of 36 caissons for the two berths have been installed, since May 2012, as part of five berths to be added to the wharf, at a cost of up to 400 million yuan ($65 million). Each caisson is 20 meters long and 20 m wide, 18.2 m high, and weighs 3,000 tons.

More than 2,200 cu m of concrete has been poured to form walls around the two berths. Construction work on No.4 and 5 has started, workers report.

A caisson is a watertight retaining structure used for engineering work on the foundation of a bridge pier, for building a concrete dam, or for ship repairs. They are in such a way that water can be kept out to allow the work area to dry.

Edited by Chen Zhilin and Roger Bradshaw

万年县| 濮阳县| 临澧县| 花垣县| 临武县| 义乌市| 清徐县| 乌鲁木齐县| 双辽市| 崇信县| 德昌县| 高唐县| 黔南| 轮台县| 永州市| 呼和浩特市| 页游| 汕尾市| 营口市| 儋州市| 准格尔旗| 九寨沟县| 涡阳县| 福海县| 吉水县| 改则县| 定远县| 贞丰县| 克什克腾旗| 牟定县| 大宁县| 虞城县| 平利县| 大连市| 衡东县| 吴忠市| 喀喇沁旗| 富顺县| 临西县| 兴国县| 宁明县|