国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

News >Bizchina

Coordination the cure for ailing road network

2010-12-07 13:38

BEIJING - China's expressways will stretch for 73,000 km by the end of this year, the second largest in the world after the United States, Minister of Transport Li Shenglin said in a recent interview.

Coordination the cure for ailing road network

But despite the network's quick development, the country needs to coordinate the development of various means of transportation to avoid more traffic jams like the astonishing week-long congestion on the Beijing-Tibet Expressway in August this year, he said.

In the past five years, the country built an average of 6,000 km of expressways each year, equal to the total length of expressways in Japan or Italy. The investment on expressways between 2006 and 2010 totaled 2 trillion yuan ($300 billion), he said.

During the past decades, roads, air transport and railways have been rolled out at a frenetic pace, which is "necessary and irreplaceable" to the country's economic development, he said.

However, the entire transportation system is running with low efficiency due to lack of coordination, the minister said.

The traffic jams on the Beijing-Tibet Expressway are an indication of the importance of coordinated transport construction, he said.

In August, thousands of trucks heading to Beijing were stuck in a section of the Beijing-Tibet Expressway for more than 10 days, forming a line more than 100 km long.

Many blamed the congestion on the expressway's design, which they said lacked foresight to handle the huge traffic that swarmed into the Inner Mongolia autonomous region for coal.

Li believed that expressways are not supposed to be used for coal transport.

Related readings:
Coordination the cure for ailing road network China to rev up passenger car safety check
Coordination the cure for ailing road network Silk Road will keep Sino-Turkish trade on the move
Coordination the cure for ailing road network Global automakers take the fast road to China market
Coordination the cure for ailing road network Chinese drivers stuck in record traffic jam

Coal-rich provinces export their resources by one of two means - by train, like Shanxi province does via the Datong-Qinhuangdao Railway, a rail link built specially for carrying coal out of Shanxi, or by turning the coal into electricity and sending power through wires.

But for Inner Mongolia, an emerging coal producer in the recent years, both those means are lacking.

The Beijing-Tibet Expressway and the No 110 national highway are the only channels that coal trucks from the autonomous region can use to reach the ports of Jinzhou and Tianjin, from where the coal is shipped. In August, repair work on the No 110 national highway forced all trucks to use the already crowded expressway.

Statistics from the ministry show traffic where the trucks were stranded has soared to twice the designed capacity. "How can the traffic on the expressway keep moving (with such a heavy flow)?" the minister said.

A railway will be built for transporting coal from Inner Mongolia to the ports, and ships will send coal from ports to other parts of the country, he said.

China took the first step toward coordinating transportation in 2008 by merging the administrations of civil aviation and postal service with the Ministry of Transport, which used to only be in charge of roads, ports and waterways.

 

Related News:

务川| 井陉县| 岳阳市| 衡东县| 平阴县| 平泉县| 临泽县| 江永县| 垣曲县| 芒康县| 扶绥县| 瓦房店市| 泰顺县| 应用必备| 仪陇县| 山东省| 曲沃县| 南部县| 昌邑市| 卓尼县| 光泽县| 合作市| 临颍县| 永靖县| 塔河县| 湖南省| 汾阳市| 天等县| 斗六市| 洮南市| 遵义市| 沁源县| 东兰县| 汝州市| 黑山县| 龙口市| 永安市| 金寨县| 永安市| 惠安县| 建昌县|