国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

China / China

Turbine of Three Gorges starts water filling test

(chinadaily.com.cn) Updated: 2011-04-27 08:33
Turbine of Three Gorges starts water filling test

An engineer works at the underground powerhouse of the Three Gorges in Yichang, Central China's Hubei province, April 26, 2011. The No 32 underground turbine launched a water-filling test on Tuesday, starting the debugging of this unit. If the test goes well as planned, the turbine will be operating starting in May. Three of all six underground generators at the Three Gorges will be operational by this summer. The project mainly includes a 185-meter-high dam, a five-tier ship lock and 32 generators, 26 of which are on the river banks and had all gone operational by October in 2008. Six underground turbins have a total designed capacity of 4.2 million kw. [Photo/Xinhua]

Previous Page 1 2 3 4 Next Page

Highlights
Hot Topics

...
望谟县| 错那县| 渭源县| 阿克陶县| 民勤县| 罗江县| 潍坊市| 高阳县| 仁怀市| 枞阳县| 阿克陶县| 扶风县| 山东省| 二连浩特市| 睢宁县| 南华县| 富阳市| 洛隆县| 肇州县| 云浮市| 长治县| 鄢陵县| 云龙县| 页游| 滨州市| 荔波县| 进贤县| 华坪县| 杭州市| 增城市| 古交市| 晋江市| 汨罗市| 通海县| 阳原县| 宝应县| 孝昌县| 北碚区| 和田市| 抚宁县| 乌拉特中旗|