国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

  .contact us |.about us

Highlights ... ...
Search:
    Advertisement
Three phases of the Three Gorges Project
( 2003-07-01 17:31) (Chinadaily.com.cn)

Three Construction Phases

First phase, 1993-1997 (five years): Project preparation and first stage of construction, culminating in the damming of the Yangtze River in November 1997. The water of the Yangtze River was diverted through a man-made canal - the diversion channel, and the water level in the Three Gorges area rose by as much as 10 meters as a result.


Second phase, 1998-2003 (six years): The second stage culminates in the first batch of turbines beginning to generate hydropower and the permanent shiplock being put into operation. The reservoir is filled between June 1 and 15, 2003, when the water level in the Three Gorges have risen from the previous 66 meters above sea level to the current 135 meters.

TGP-Second Phase


Third phase
, 2004-2009 (six years): The project is to be completed in 2009, when all 26 generators will be operating. The water level will be raised to 156 meters in September 2006. At the completion of the project in 2009, the water level will reach 175 meters, referred to as the "normal pool level.
TGP Third Phase




   
Close  
  Go to Another Section  
     
 
 
     
  Article Tools  
     
  E-Mail This Article
Print Friendly Format
 
     
   
        .contact us |.about us
  Copyright By chinadaily.com.cn. All rights reserved  
泸溪县| 昌乐县| 建平县| 乃东县| 金阳县| 偃师市| 洮南市| 永寿县| 中山市| 桦南县| 大埔区| 丰顺县| 梅河口市| 珲春市| 黔南| 理塘县| 胶州市| 阿拉善左旗| 郎溪县| 辛集市| 襄樊市| 顺义区| 乐陵市| 察哈| 怀宁县| 正宁县| 富阳市| 绵竹市| 锡林浩特市| 封开县| 太原市| 铜鼓县| 丹巴县| 沙湾县| 南宁市| 镇康县| 新乐市| 昌图县| 韶关市| 康定县| 加查县|