国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

USEUROPEAFRICAASIA 中文雙語Fran?ais
Home / Comment

Chariot Resources rides on Peru copper

China Daily | Updated: 2009-09-01 07:48

Chariot Resources rides on Peru copper

Owner of one of the world's premier advanced stage copper projects, Chariot Resources Ltd (TSX: CHD) is fast reaching the production stage in its Mina Justa Project at Marcona Copper in Peru.

The project manned by skilled engineers and workers benefits from its proximity to infrastructure such as roads, power, water and several ports. After more than 220,000 m of test drilling, its deposits are now estimated to total 6.8 billion pounds of copper in the ground. In its feasibility study released in April, Chariot Resources announced that with the price of copper at $2 a pound and at a discount rate of 8 percent, Mina Justa had a pre-tax net present value (NPV) of $616.2 million with an internal rate of return (IRR) of 19.9 percent.

The weighted average cash operating cost over the life of the mine is estimated at $0.885 cents a pound, placing it in the lower half of world copper production costs. Also, the project's after-tax NPV, at 8 percent of the project, is $326.3 million, with an IRR of 15 percent.

Chariot Resources rides on Peru copper

Today's Top News

Editor's picks

Most Viewed

Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
惠安县| 宜兰县| 建平县| 偃师市| 景德镇市| 寻甸| 泾阳县| 多伦县| 吉木乃县| 西畴县| 勐海县| 柞水县| 六盘水市| 临桂县| 廉江市| 马鞍山市| 开原市| 吉木萨尔县| 邹城市| 平阴县| 宁夏| 龙里县| 连州市| 海盐县| 紫阳县| 元谋县| 涟水县| 托里县| 台山市| 囊谦县| 南陵县| 巴塘县| 河曲县| 灌阳县| 沙雅县| 惠安县| 石渠县| 阿克陶县| 济阳县| 墨竹工卡县| 濉溪县|