国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

   
  home feedback about us  
   
CHINAGATE.WEST DEVELOPMENT    
    Key Issues  
 
  Sustainable development & environment  
  Industrial restructuring  
  Infrastructure  
  Market mechanism  
  Capital market  
  High-tech  
  Education & HR  
  Overseas Investment  
  Minority prosperity  
  East-west cooperation  
  Agriculture  
  Travel  
 
 
       
       
       
     
       
       
       
       
 
 
 
China to raise Three Gorges Project's water level


2008-09-28
Xinhua

China is to begin raising water levels at the Three Gorges Project on Sunday, the developer of the massive water conservancy project announced on Saturday.

The trial operation is set to begin at midnight Sunday.

The water behind the dam would be raised to an unspecified higher level subject to conditions of the Yangtze River, where the project was built, the China Three Gorges Project Corporation (CTGPC) announced with approval of the State Council, the cabinet.

As of Saturday afternoon, the water level was 145.39 meters.

The plan takes into consideration both electricity generation and lower reaches navigation, and it should take more than a month, the company said.

Experts said there was no need to worry about flood control safety as historical data prove it is unlikely to have major flood peaks on the upper reaches of the Yangtze River after mid-September. They also said a higher water level wouldn't cause massive silting, or lead to serious natural disasters in nearby areas.

The Three Gorges Project, launched in 1993 with a budget equivalent to $22.5 billion, is a multi-functional water control system built at the upper and middle reaches of the country's longest river.

Its main works are a dam, a five-tier ship lock, as well as 26 hydropower turbo-generators. Its key functions include flood control and power generation.

The project has been constructed in three phases. Storing water at the 175 meter level is a requirement for the last phase of construction.

The Three Gorges dam will have 14 turbo-generators on the left bank and 12 on the right which will produce 84.7 billion kw of electricity annually.

Monday, developers said the turbines will finish being installed in November.

There are plans to add six more turbines by 2012.

As of June, 1.24 million residents were relocated to make way for construction of the dam.

 

 
   
 
home feedback about us  
  Produced by www.hwdly.com.cn. All Rights Reserved
E-mail: webmaster@chinagate.com.cn
昌图县| 商城县| 米易县| 梧州市| 西林县| 靖安县| 神池县| 元谋县| 鲁山县| 晋城| 岳普湖县| 邛崃市| 丽水市| 班玛县| 山东省| 秦安县| 广丰县| 旬阳县| 砀山县| 长顺县| 集贤县| 安岳县| 黎城县| 南漳县| 高陵县| 建宁县| 万盛区| 平乡县| 青阳县| 彭州市| 奇台县| 抚顺县| 曲阜市| 延安市| 积石山| 建德市| 治县。| 稻城县| 博乐市| 江华| 铁力市|