国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

USEUROPEAFRICAASIA 中文雙語Fran?ais
China
Home / China / National affairs

Public comment sought on Beijing-Xiongan high-speed rail

By Luo Wangshu | China Daily | Updated: 2017-07-24 06:37

Planners release environmental impact assessment for 100.3-kilometer corridor

An environmental impact assessment for a new high-speed railway linking Beijing and Xiongan New Area was released on Saturday. It was the first public acknowledgment that a new line will be built.

China Railway Design Corp announced the assessment on its website and is seeking public comment.

According to the notice, the Beijing-Xiongan railway will start at Liying in Beijing's Daxing district, pass through Langfang and terminate at Xiongan East Railway Station-a total length of 100.3 kilometers.

The new line will also pass through the capital's new airport, which will be about 36 km from Liying and about 64 km from Xiongan New Area. The airport is expected to open in 2019.

The existence of a railway plan was reported in April by Tianjin News. According to the report, a planning map showed two railway stations in the new area-Xiongan Railway Station and Xiongan East Railway Station. The environmental assessment covers the latter.

According to an earlier report, the Tianjin-Xiongan railway route will connect the area with Tianjin's new railway station, which is also in the planning stages.

An older rail line is already in operation. Passengers must transfer in Baoding or Tianjin to get to the Xiongan area on high-speed rail.

Since July 7, four daily high-speed railway services have been started. The journey takes one hour and 50 minutes.

The new Beijing-Xiongan line follows a different route.

Xiongan New Area is located in the center of a triangular area defined by Beijing, Tianjin and Shijiazhuang, capital of Hebei province.

Located about 100 km southwest of downtown Beijing, the new area will mostly cover Xiongxian, Rongcheng and Anxin counties in Hebei.

It will eventually encompass 2,000 square kilometers, with a population of up to 2.5 million people.

Under the area's development plan, a major transportation network should be in place in Xiongan by 2020. The area will be well connected to Beijing, Tianjin and other cities in Hebei by 2022, when the Winter Olympic Games will be held.

Xiongan New Area is intended to house the bulk of Beijing's noncapital functions, including some administrative and public institutions, company headquarters, financial institutions, higher education institutions, and science and technology units.

Editor's picks
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
密云县| 富锦市| 东乡族自治县| 修水县| 高要市| 合山市| 江油市| 海丰县| 吉安县| 锡林浩特市| 德清县| 天津市| 江津市| 望奎县| 海原县| 安阳市| 井陉县| 梧州市| 洮南市| 墨脱县| 青州市| 桃园县| 湘潭县| 肥乡县| 宜都市| 安新县| 开封县| 平安县| 五大连池市| 乌鲁木齐县| 慈利县| 西乌| 武平县| 酉阳| 固镇县| 南郑县| 大石桥市| 普格县| 滦南县| 通许县| 泸定县|