国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

China / Society

China technically prepares for Qinghai-Tibet Expressway

(Xinhua) Updated: 2014-10-07 20:46

XI'AN - The nation has the capability to build an expressway linking up Tibet autonomous region and Qinghai province in west China if major technical barriers are overcome, a chief technical consultant for the planned project said on Tuesday.

If China can overcome the technical barriers, an expressway linking Tibet autonomous region and Qinghai province in west China is feasible, a senior consultant with the project said Tuesday.

"Technically, we have the confidence to build the Qinghai-Tibet Expressway," Wang Shuangjie, Party chief of the CCCC First Highway Consultants Co., Ltd., said.

Heading a technical support team for the project, Wang said the primary technical barrier lies in the 500-km frozen earth belt along the planned 1,900-km expressway that links Tibet's regional capital of Lhasa with Qinghai provincial capital Xining.

Lhasa is the only regional capital that's not connected by China's expressway network, but the Sichuan-Tibet highway, along with Qinghai-Tibet highway and Xinjiang-Tibet highway, are the three major roads to Tibet.

Extreme conditions on the Qinghai-Tibet Plateau, such as high altitude, low oxygen content, strong solar radiation and freezing temperature, pose challenge to the expressway's construction and its future maintenance, Wang said.

The expressway will span areas where the average altitude is above 4,500 meters and annual average temperature below zero.

Wang and his team also need to address problems concerning the possible environmental effect of the expressway and come up with proper technology to repair the fragile ecological environment once it is damaged.

He said the suggestion to build the expressway based on the existing roadbed of the Qinghai-Tibet Highway is not feasible due to price.

Currently, China has completed the construction of the roadbed of the expressway's 300-km session between Xining and Caka in Qinghai, while construction of the 400-km session linking Xining with Golmud is still under way.

The rest of the 1,100-km section remains a hard nut to crack for engineers, but what was learned in building the high-altitude Qinghai-Tibet railway may help.

Opened in 2006, the highest railway in the world was lauded as an engineering feat for covering hundred of kilometers over harsh terrain and frozen ground.

China technically prepares for Qinghai-Tibet Expressway China technically prepares for Qinghai-Tibet Expressway

Xi stresses better transport for Tibet 

Passenger transport starts on Tibet's new railway 

 

Highlights
Hot Topics
...
道孚县| 抚松县| 冷水江市| 伊通| 博乐市| 临夏县| 东方市| 湖南省| 阜南县| 汾西县| 宝鸡市| 武鸣县| 凤台县| 万全县| 甘肃省| 佛山市| 北票市| 双柏县| 沈丘县| 永济市| 九龙坡区| 淮安市| 湟源县| 高密市| 高清| 宜昌市| 西盟| 桂东县| 离岛区| 祁东县| 麦盖提县| 宜昌市| 吴忠市| 肥东县| 潮安县| 肃南| 溧阳市| 南岸区| 榆中县| 瓦房店市| 钟祥市|