国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

   

LegCo urges to speed up cross-border links

(China Daily HK Edition)
Updated: 2007-02-08 09:01

Legislative Council (LegCo) yesterday passed a motion debate asking the government to speed up cross-boundary transport infrastructure projects to beef up bilateral ties between Hong Kong and the mainland.

In order to cope with the anticipated gridlock in New Territorities West caused by huge incoming cross-boundary vehicles from the scheduled operation of the Shenzhen Western Corridor on July 1, legislators further suggested widening the toll-free Tuen Mun Highway, buying out the Route 3 and then reducing the tolls to attract more motorists to use it as an alternative route.

The government, however, said it would attach great importance to the 11th Five-Year Plan and two major cross-boundary projects the Western Corridor and the Lok Ma Chau Spur Line would come into operation this year or the next.

However, there are inconsistencies in other major projects which has to be rationalized before they can go ahead, the government said.

In moving the original motion, Cheung Hok-ming from the Democratic Alliance for the Betterment and Progress of Hong Kong referred to the SAR government's action agenda for the 11th Five-Year Plan that highlighted the importance of cross-boundary cooperation.

In particular, he urged the government to speed up cross-boundary infrastructure projects like the Guangzhou-Shenzhen-Hong Kong Express Rail Link, Liantang Eastern Corridor and the Hong Kong-Zhuhai-Macao Bridge.

"The Guangzhou-Shenzhen-Hong Kong Express Rail Link is a strategic railway that connects Hong Kong with mainland provinces and cities," he said.

The Democratic Party's Albert Ho and Andrew Cheng both introduced amendments to the original motion.

Ho called for widening of the Tuen Mun Highway to four-lane traffic and construction of the northern section of the Route 10.

Cheng asked the government to consider buying out the Route 3 or extend its franchise period and then reduce the tolls to encourage more drivers to use it as alternative route.

Many other legislators also agreed to build a fifth eastern land control point at Liantang on the mainland side to improve cross-boundary traffic.

After completion of the eastern corridor, said the Liberal Party's Miriam Lau, cross-boundary traffic can save a lot of time as incoming and outgoing vehicles can use the same route without the need to use the western corridor and pass through Shenzhen city center.

In the end, it was Cheung's motion as amended by Ho that was carried by the majority.

On the Guangzhou-Shenzhen-Hong Kong Rail Link, Secretary for Environment, Transport and Works Sarah Liao said this regional express was originally designed as a one-hour train service for the benefit of business travelers, but now it is intended as a point-to-point network connecting major cities across the country.

"This involves the positioning of control points. Also, the Guangzhou-Hong Kong section must be built upon a shared corridor option," she said.

"If the rail link is intended to connect the whole country, we must first ascertain how much of the overall capacity is set aside for Hong Kong's use. If not, we cannot shorten the travelling time even if we build the speedy, dedicated rail link."

She said the bridge involved the interests of the three places in terms of routing, construction pattern and capital financing. As convener of the three-party working group, Hong Kong has set forth 25 detailed study areas on top of questions of environmental protection and whether a tunnel should be built. "We hope to implement the project as soon as the problems are ironed out," she said.



Top China News  
Today's Top News  
Most Commented/Read Stories in 48 Hours
镇原县| 合山市| 龙泉市| 光泽县| 淄博市| 巴林右旗| 锡林浩特市| 闽侯县| 曲沃县| 定结县| 昌邑市| 大化| 龙川县| 北宁市| 临夏县| 新余市| 洛浦县| 瑞金市| 都兰县| 靖安县| 峨山| 滨州市| 玛沁县| 商城县| 大港区| 潍坊市| 乌恰县| 明溪县| 台江县| 镶黄旗| 丹江口市| 邯郸市| 松溪县| 大关县| 鄂尔多斯市| 广汉市| 西贡区| 瓦房店市| 黄梅县| 商洛市| 屏东县|