国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

USEUROPEAFRICAASIA 中文雙語Fran?ais
Business
Home / Business / Companies

Chinese CMEC starts expansion works at Serbia's Drmno coal mine

Xinhua | Updated: 2017-01-24 10:19

DRMNO - China Engineering Machinery Corporation (CMEC) on Monday began assembling modern mining equipment at a mine here in order to increase its production for the Electric Power Industry of Serbia (EPS) in a project worth $123 million.

Serbian state officials and those from the Chinese embassy met at the Drmno mine, where representatives of EPS and CMEC signed a decision to begin works on installing equipment.

Serbian energy and mining minister Aleksandar Antic said at the signing ceremony that the beginning of the installation of the ECS (Excavator-Conveyor-Spreader) system would provide an additional three million metric tons of coal per year for the functioning of the new block unit at the Kostolac power plant, also being constructed by CMEC.

"By 2020, Serbia will get its first new block-unit energy facility that has the capacity of 350 megawatts, which will significantly influence our energetic security. The first precondition for us to use the new block unit is to have enough coal here in Drmno, and for this we need a modern ECS system that will increase the production of coal," Antic explained.

He concluded that the works at Drmno were important for Serbia and its whole energy system together with the construction of the new block unit because "this is the only way EPS can continue producing energy for the accelerated development of Serbia."

The project, to be completed in 47 months, foresees installation of an ECS system to the Drmno coal mine consisting of a rotary excavator, eight conveyors with 12 km-long conveyor system and a spreader with the capacity of 8,500 cubic meters per hour, as well as two new substations.

Acting general director of EPS, Milorad Grcic, estimated that "this day presents a beginning of new era for the municipality of Kostolac and the city of Pozarevac, and it's a guarantee for a bright future of this region."

He explained that ECS system was everything Drmno mine needed to increase production from nine to 12 million tons of coal, that it would pay off in five years while it would be in operation for the next 39 years, which would provide Serbia with necessary energy security.

"This system complies with the highest EU standards and environmental protection, and will provide an additional three million tons of coal per year. Completion of works should coincide with the completion of the new block with the capacity of 350 megawatts. Without this coal, our energy sector could not function," Grcic said.

Chinese ambassador to Serbia Li Manchang referred to the project as yet another achievement of the strategic partnership between Serbia and China.

The works on installing the ECS system are a part of the second section of the Kostolac B Power Plant project that has a total value of $715.6 million, 85 percent of which were provided by EXIM bank.

According to a CMEC statement, the new excavator will be installed by the end of the month, works on the conveyor will begin in February and once that is completed the company will proceed installing substations, a conveyor system, and other elements.

Most Viewed in 24 Hours
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
池州市| 六盘水市| 盘锦市| 鹤峰县| 荔波县| 文昌市| 乐至县| 武隆县| 平阴县| 彰武县| 博客| 延长县| 荔浦县| 邳州市| 北京市| 芒康县| 镇平县| 乌审旗| 汉源县| 辽阳市| 盐津县| 五河县| 兴义市| 仪征市| 天柱县| 吴江市| 武鸣县| 武安市| 宜阳县| 拜城县| 浦东新区| 临洮县| 平顺县| 高州市| 昭苏县| 姜堰市| 隆安县| 崇信县| 新巴尔虎右旗| 吉林市| 郧西县|