国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

   

Guangdong plans nuclear power plants

By Chen Hong (China Daily)
Updated: 2006-12-25 06:54

Shenzhen: South China's Guangdong Province is planning to spend nearly 74 billion yuan (US$9.45 billion) building three major nuclear power stations by 2010.

The size of the investment will set a precedent for spending on power-generation, surpassing outlays on traditional coal-fired and hydroelectric power plants, Xinhua News Agency reported yesterday.

During the 11th Five-year Plan (2006-10), Guangdong will focus on developing the second phase of the Ling'ao Nuclear Power Station, the first phase of Yangjiang Nuclear Power Station and the first phase of Taishan Nuclear Power Station, said Chen Shanru, director of the Development and Reform Commission of Guangdong Province.

By 2020, the installed capacity of all nuclear power stations in Guangdong is expected to reach 24 million kilowatts, accounting for 60 per cent of the country's total nuclear power output.

Of the country's current installed capacity of 8.7 million kilowatts, nearly 4 million kilowatts are generated in Guangdong.

The project is part of a larger effort to restructure the province's power-supply. The project's goal is to develop more clean energy to fuel Guangdong's fast-growing economy, Chen was quoted as saying.

The province, which is home to the country's largest economy, lacks the energy resources necessary to develop traditional power stations. Guangdong imports most of its coal and petroleum from other parts of the country or from abroad.

Construction of the second phase of Ling'ao Nuclear Power Station in Shenzhen started at the end of last year.

It was the country's only nuclear power station project between 2001 and 2005. Its two 1-million-kilowatt power generators will start operating in 2010 and 2011.

Construction of the first phase of the Yangjiang Nuclear Power Station will start early next year.

The time frame for the Taishan Nuclear Power Station has not been decided yet.

Both the Yangjiang and Taishan plants are located in West Guangdong.

Chen said the province had chosen 10 sites for new nuclear power stations, and the feasibility studies have been going smoothly.

Two projects, located in Zhaoqing and Yunfu, are expected to take priority among the 10, according to the Xinhua News Agency report.

(China Daily 12/25/2006 page3)


(For more biz stories, please visit Industry Updates)



华阴市| 嵊泗县| 长汀县| 永嘉县| 土默特左旗| 中江县| 许昌市| 穆棱市| 皮山县| 惠东县| 嵊州市| 收藏| 沅陵县| 同江市| 福贡县| 鹰潭市| 通道| 渑池县| 哈巴河县| 井研县| 平遥县| 灵川县| 神池县| 汝南县| 乌苏市| 宁国市| 华坪县| 手游| 河南省| 贵定县| 侯马市| 南昌市| 武隆县| 尉犁县| 黄骅市| 诏安县| 越西县| 富川| 嵊泗县| 阳谷县| 米易县|