国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Economy

China's Three Gorges Dam accelerates water discharge

(Xinhua)
Updated: 2011-05-20 17:25
Large Medium Small

BEIJING -- The Three Gorges Dam, the world's largest hydroelectric project, has started to increase its water release to ease severe drought plaguing downstream rice-growing areas on Friday.

From May 20 to 24, the dam will accelerate its discharge rate to 10,000 cubic meters per second, about 3,000 cubic meters faster than its inflow rate, the State Flood Control and Drought Relief Headquarters (SFDH) said in a statement.

The rate will be increased to 11,000 to 12,000 cubic meters per second between May 25 and June 10.

Related readings:
China's Three Gorges Dam accelerates water discharge Projects to ease impact of Three Gorges Dam
China's Three Gorges Dam accelerates water discharge Three Gorges Dam releases water to ease drought
China's Three Gorges Dam accelerates water discharge Three Gorges Dam to unleash water, ease drought
China's Three Gorges Dam accelerates water discharge China's Three Gorges Project to be completed in five years

The dam, whose main body is located in the town of Sandouping in Hubei province, has discharged 17 billion cubic meters of water to areas downstream since the beginning of this year.

Consequently, water levels in the middle and lower reaches of the Yangtze River, China's longest river, have risen by 0.63 meters and 2.12 meters, respectively, from record lows.

Water release lifted the water levels at key sections of the Yangtze River, which effectively helped ensure water supplies in those areas, SFDH said.

During the January-April period, the Yangtze River basin received 40 percent less rainfall than the past 50-year average.

Dwindling water levels in rivers have affected agricultural irrigation capabilities and water supplies for daily living, seriously affecting some parts of Hubei and Hunan provinces.

The Three Gorges Project consists of a dam, a five-tier ship dock and 26 hydropower turbo-generators. The project generates electricity, controls flooding by providing storage space and adjusts shipping capacity.

The project was launched in 1993 with a budget of about $22.5 billion.

分享按鈕
固始县| 苏尼特左旗| 吴江市| 上饶县| 淮北市| 灵石县| 巴里| 文登市| 诸暨市| 曲阳县| 都兰县| 广宁县| 尤溪县| 和田市| 湖南省| 门头沟区| 黄陵县| 鄱阳县| 汉沽区| 千阳县| 广昌县| 澳门| 陇川县| 嘉祥县| 巴马| 孝感市| 维西| 修水县| 比如县| 四子王旗| 阳西县| 于田县| 额尔古纳市| 亚东县| 原平市| 铅山县| 防城港市| 乌鲁木齐市| 无为县| 新密市| 宣威市|