国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Biz News Flash

Beijing subway's Changping Line in trial operation

(Xinhua)
Updated: 2010-09-19 17:06
Large Medium Small

BEIJING - Beijing subway's Changping Line was put into trial operation Sunday and is scheduled to go into official operation by the end of 2010, said subway constructors.

The Changping line, together with four other lines scheduled for operation by the end of the year, will extend the length of Beijing's subway to 300 km, according to subway constructors.

Beijing subway's Changping Line in trial operationStem trade disputes, China urges US
Related readings:
Beijing subway's Changping Line in trial operation VisionChina inks new deal with Beijing subway
Beijing subway's Changping Line in trial operation VisionChina wins?exclusive right to operate mobile television advertising 
Beijing subway's Changping Line in trial operation 4.8m subway commuters every day in Beijing
Beijing subway's Changping Line in trial operation Beijing subway ticket to remain at low price
The line links Xi'erqi station on Line 13 to Chengnan Station in Changping district, with seven stations covering 22 km. The designed train speed is 100 km per hour, said a spokesman with Beijing Railway Construction and Management Co, Ltd.

The second phase construction will extend the line to the city's far north, Ming Tombs Scenic Area, covering 10 km with five stations, he said.

Four new lines, namely Yizhuang Line, Fangshan Line, Daxing Line and No 15 Line, will open in 2010. Beijing plans to extend subway system to 561 km by 2015.

上虞市| 桦南县| 汕尾市| 增城市| 宁阳县| 本溪市| 岫岩| 彝良县| 紫金县| 友谊县| 澎湖县| 南澳县| 克东县| 仲巴县| 铜陵市| 舟曲县| 石城县| 霸州市| 罗定市| 杭锦后旗| 延川县| 武城县| 涿州市| 周至县| 阿拉善左旗| 松潘县| 全南县| 财经| 白水县| 大宁县| 安丘市| 华池县| 白城市| 咸宁市| 蒲城县| 灵石县| 临海市| 花垣县| 沾益县| 阿勒泰市| 太仓市|