国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Energy

Slowing growth does not deter wind power's long-term promise

(China Daily)
Updated: 2009-11-16 08:00

China's wind power industry is still promising in the long run, although the growth rate will inevitably slow down compared to that of previous years, according to a report from the international consulting firm Frost & Sullivan.

The installed capacity of China's wind power increased from 402 megawatts (mW) in 2001 to 12,150 mW in 2008, with a growth rate higher than the world average since 2004.

Frost & Sullivan estimated the cumulative installed capacity of China wind power to exceed 100 million kilowatts (kW) in 2020, which indicates a compound growth rate between 20 percent and 30 percent from 2009 to 2020 -- far below the previous rate of nearly 100 percent.

Frost & Sullivan said it sees great investment opportunities in wind farm construction, wind power equipment manufacturing and related industries.

Related readings:
Slowing growth does not deter wind power's long-term promise Vestas hikes investment into China
Slowing growth does not deter wind power's long-term promise Chasing China's wind power, with pure heart
Slowing growth does not deter wind power's long-term promise Rudong to set up more clean power projects
Slowing growth does not deter wind power's long-term promise 
Wind may prop China's power rush

Wind farm construction

The forthcoming revitalization plan of the Chinese government for the new energy industry will increase the installed capacity of wind power substantially.

By 2020, the total capacity is expected to exceed 100 million kW, and the following six wind power bases with capacities of more than 10 million kW capacities are the key national projects.

The Jiuquan, Gansu, 10-million-class wind power base has a planned total installed capacity of 35,650 mW, and has completed the tendering of the wind turbines for the first stage of construction.

The other projects are the Hami, Xinjiang Uygur autonomous region, planned 20 million kW base, Inner Mongolia planned 50 million kW base, Hebei planned 10 million kW base in coastal and northern areas and the Jiangsu planned 10 million kW base.

Current investors in China's wind power farms are mainly central or local State-owned electric power and energy enterprises, with few private or foreign enterprises.

For the installed capacity added in 2008, the five major power generation and energy groups accounted for approximately 76 percent. This indicated the increasing concentration of wind power operators.

   Previous Page 1 2 Next Page  

临夏县| 凌海市| 将乐县| 景德镇市| 江西省| 邹城市| 威海市| 东丰县| 阳曲县| 都匀市| 顺昌县| 大洼县| 札达县| 即墨市| 西藏| 武胜县| 凤阳县| 尼勒克县| 武宣县| 邳州市| 呈贡县| 慈溪市| 彰化市| 肥城市| 察雅县| 永清县| 洪江市| 云林县| 富阳市| 五指山市| 泽州县| 蕉岭县| 肃北| 石狮市| 惠来县| 英吉沙县| 高邮市| 仁怀市| 开原市| 鄄城县| 贵州省|