国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

BIZCHINA> Center
Beijing-Shijiazhuang railway under construction
(Xinhua)
Updated: 2008-10-07 14:14

Construction began on a high-speed passenger rail line between Beijing and Shijiazhuang, capital of north China's Hebei province Tuesday, the Ministry of Railways (MOR) said.

The new 281 kilometer line is part of another route which connects Beijing, Guangzhou and Hong Kong in south China. It totals more than 2,300 km long.

With an estimated cost of 43.87 billion yuan ($6.42 billion), the Beijing-Shijiazhuang line is expected to be complete and in operation in four years. It is jointly funded by the MOR, Beijing and Hebei governments.

The designed speed of the railway is 350 km per hour. Initially, however, trains will only travel 300 km per hour.

Once operating, this new line should cut the journey from Beijing to Shijiazhuang from 119 minutes to less than 60 minutes, the ministry said.

The new line will have six stations.

Seventy-seven percent of it, or about 218.47 km, will be built on an elevated alignment to save land.

In the meantime, Chinese workers will also be building a 28.7-km-long railway linking Shijiazhuang to Taiyuan, capital of Shanxi province.

The MOR said it hopes to build 9,800 km of passenger-dedicated railway over its Five-year Plan (2006-2010).


(For more biz stories, please visit Industries)

 

 

张掖市| 临夏市| 邯郸县| 介休市| 页游| 中宁县| 新巴尔虎左旗| 崇左市| 固始县| 安庆市| 清流县| 崇文区| 会泽县| 长泰县| 紫云| 电白县| 荥阳市| 盐山县| 达州市| 上栗县| 油尖旺区| 贵州省| 河曲县| 和田市| 荆门市| 山西省| 雷波县| 灵石县| 修武县| 安多县| 宿迁市| 广汉市| 平遥县| 贵溪市| 定结县| 固阳县| 邵阳市| 绥德县| 抚松县| 德州市| 江油市|