国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

A decade on, high-speed rail still delivering in western China

1,786-km Lanzhou-Urumqi line puts growth on faster track

By YANG ZEKUN | China Daily Global | Updated: 2024-08-20 10:22
Share
Share - WeChat
Ma Wanli inspects the Gaojiawan Tunnel on the Lanzhou-Urumqi high-speed line in Ledu, Qinghai province, last month. [Photo provided to China Daily]

Ma moved from his hometown in Henan province to live in Xining, the capital city of Qinghai, with his parents when he was 7, as his parents were also railway employees working in the province.

He majored in clinical medicine in college, but influenced by his parents, learned a lot about railways and passed the examination to join the China Railway Qinghai-Xizang Group in 1996.

Ma and his team are responsible for the inspection and maintenance of high-speed railway bridges, tunnels, culverts and other critical equipment. They usually work between midnight and 4 am when the train traffic is relatively light.

Despite working at an altitude of more than 3,000 meters for the past 28 years, Ma hasn't missed a single inspection or made an erroneous judgment.

The team needs to promptly identify and address problems and hidden dangers along the route such as whether drainage outlets within protective fences are blocked, if there is floating debris, or if local residents are engaging in activities like burning waste or building sheep pens along the route's fence line.

The environmental issues along the rail line also fall within their scope. In the first few years, Ma and his team encountered villagers dumping piles of straw along the rail fences or burning waste. When they tried to dissuade them, the villagers often didn't understand and refused to cooperate, making the work difficult. They had to collaborate with village officials to address these issues.

The area is prone to strong winds, and debris on the tracks can affect train safety, Ma said. In recent years, increased rainfall and haphazard construction have led to poor drainage, also impacting safety.

After 10 years of operation, the residents around the railway tracks have developed a basic awareness of safety and understand the significant benefits of the railway's safe operation for the local community, he said.

"In maintaining the railway's normal operation, great responsibility, patience, a strong will to keep learning and a continuous spirit of innovation are required," said Ma.

|<< Previous 1 2 3 4 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
荃湾区| 绍兴市| 东台市| 沂源县| 宁阳县| 新沂市| 卓资县| 舟曲县| 衡东县| 金坛市| 墨竹工卡县| 黑河市| 隆德县| 张家界市| 宁海县| 阿合奇县| 嘉禾县| 保定市| 年辖:市辖区| 浦北县| 沛县| 察雅县| 建阳市| 岐山县| 舒城县| 水富县| 新巴尔虎右旗| 彝良县| 大同县| 崇州市| 安新县| 英山县| 岐山县| 清水河县| 凤凰县| 天水市| 海伦市| 灵川县| 渭南市| 太原市| 友谊县|