国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語Fran?ais
Business
Home / Business / Industries

Universal Beijing Resort starts formal operation

Xinhua | Updated: 2021-09-20 16:31
Share
Share - WeChat
Tourists visit the Wizarding World of Harry Potter at the Universal Beijing Resort in Beijing, Sept 20, 2021. The Universal Beijing Resort, currently the largest in scale worldwide, opened to the public on Monday. [Photo/Xinhua]

ANCIENT CAPITAL MEETS MODERN RESORT

Relying on world-renowned Intellectual Properties such as Transformers, Minions, Harry Potter and Jurassic World, the Universal Beijing Resort attracted tens of thousands of tourists during the trial operation in early September.

Of the resort's seven theme lands, Kung Fu Panda Land of Awesomeness, Transformers Metrobase and WaterWorld are specially set up for Chinese tourists.

"We take full consideration of the actual needs and cultural preferences of Chinese consumers," said Tom Mehrmann, president and general manager of Beijing International Resort Co Ltd Theme Park and Resort Management Branch.

In addition to Chinese cultural elements, "made-in-China" also shines in the resort. The construction of the Universal Beijing Resort has made use of a large amount of Chinese-made equipment, displaying the strength of China's manufacturing industry.

Walking into the theme land of Jurassic World Isla Nublar, visitors see a rockery standing tall and spring water falling from a height of 50 meters, bringing to mind scenes from a film.

"This giant rockery was built with more than 10,000 steel components by Chinese engineers through computer control and modular construction," said Shen Shuaishuai, with the China Construction Second Bureau Installation Engineering Co Ltd, one of the resort's construction contractors.

More Chinese high-end technologies such as big data, artificial intelligence, cloud computing, 3D scanning, 3D printing, and modern surveying and mapping technology have also been widely applied in the construction process.

"The construction took just two and a half years. The use of Chinese high-end technologies has greatly shortened the construction period," said Wang Tayi, general manager of Beijing International Resort Co Ltd.

Top
BACK TO THE TOP
English
Copyright 1995 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
CLOSE
 
金华市| 清镇市| 军事| 漯河市| 绵竹市| 镇巴县| 镇坪县| 丹巴县| 南漳县| 腾冲县| 蒲城县| 盐亭县| 抚州市| 行唐县| 江源县| 杂多县| 双牌县| 汉川市| 肥西县| 通化县| 南和县| 屏东市| 通城县| 松江区| 康马县| 建宁县| 久治县| 江西省| 波密县| 连云港市| 喀喇沁旗| 永宁县| 泰和县| 隆子县| 绥中县| 普宁市| 迁安市| 于都县| 盐源县| 根河市| 彭州市|