国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語(yǔ)Fran?ais
World
Home / World / Asia-Pacific

Chinese companies to construct 'most complicated' section of Nepal's road project

Xinhua | Updated: 2021-05-15 21:41
Share
Share - WeChat

KATHMANDU -- Two Chinese companies will be involved in constructing a part of Kathmandu-Terai Fast Track project, one of the National Pride Projects in Nepal, after the Nepal Army signed a contract with them on Friday, a senior military official said.

"Separate contracts were signed with China State Construction Engineering Corp. Ltd and Poly Changda Engineering Co. Ltd on Friday for the construction of three tunnels, a few bridges and a partial road under the Fast Track project," Brigadier General Shantosh Ballave Poudyal, spokesperson for the Nepal Army, told Xinhua on Saturday.

The Nepali government in 2017 authorized the Nepal Army to develop this highly prioritized project.

Once developed, this 72.5-km expressway will link the capital Kathmandu with southeastern Nijgadh town of the Bara district and cut travel time to less than an hour from several hours now.

An international airport has also been planned in Nijgadh and this road is expected to help the international travelers from the proposed airport to Kathmandu through this expressway.

The Nepal army is developing this project by separating it in 11 different clusters.

"The cluster where the two Chinese contractors will be involved is considered as the most complicated section of the entire road project because of need to construct the tunnels," said Poudyal.

According to the Nepal Army, the Chinese companies are expected to complete their works within three and a half years including a design period for around six months.

Initially, the Nepal Army was involved in opening track of this road project in 2009 and it completed the task in 2013. Later the project was handed over to it to develop the entire project in 2017.

This project has been touted as one of the game changer infrastructure projects in the country as it is expected to contribute to the economic integration between capital Kathmandu and the southern plain, a belt of agriculture and industrial production.

Most Viewed in 24 Hours
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
通江县| 天气| 伊宁市| 准格尔旗| 建阳市| 霍山县| 葫芦岛市| 余姚市| 河曲县| 沙河市| 林周县| 孝感市| 太仆寺旗| 高阳县| 洪雅县| 文成县| 孟连| 屯昌县| 滨海县| 洛川县| 长汀县| 莫力| 武鸣县| 和龙市| 皋兰县| 桓台县| 沙湾县| 南丰县| 平谷区| 安阳县| 宽城| 寿宁县| 兴义市| 台安县| 云龙县| 绥中县| 望城县| 轮台县| 富裕县| 布拖县| 板桥市|