国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Environment

Coastline to provide natural storm defense

By Chen Zimo | China Daily | Updated: 2019-03-18 09:53
Share
Share - WeChat
A major landscape development under construction along the Tianmu River, the main watercourse through the new district of Hengqin in Zhuhai, Guangdong province, in December.Provided To China Daily

Authorities plan to use the existing environment to ensure improved protection from typhoons in the Greater Bay Area. Chen Zimo reports from Hong Kong.

Coastal areas across the Guangdong-Hong Kong-Macao Greater Bay Area are to be fortified against "once-in-a-century typhoons", which, despite the name, seem to be arriving more frequently.

Super typhoons have become a plague along the coasts of Hong Kong and Guangdong province, prompting governments to preserve and recreate natural seashores.

References to Typhoon Hato (2017) and last year's Typhoon Mangkhut prompt painful recollections of catastrophic winds and storm surges - one indelibly imprinted image is of a storm surge, five stories high, smashing into Heng Fa Chuen, a private housing complex in Chai Wan in the east of Hong Kong Island.

The complex, on land reclaimed from a pebble beach, was developed in the 1970s by the Mass Transit Railway Corp and was connected to the MTR's undersea tunnel nearby.

From the beginning, there were reports of severe flooding during extreme weather. Heng Fa Chuen, on the frontline of the typhoon track, suffered heavy damage every time a major storm struck. Among the most notable events were Typhoon Nesat in 2011 and Typhoon Hagupit in 2008.

In November, two months after Mangkhut struck, the Hong Kong Special Administrative Region government promised to commission a study of low-lying coastal areas and other districts vulnerable to high winds to assess the impact of wind and waves.

The city's Civil Engineering and Development Department is arranging funding and choosing consultants for the work, which is expected to begin soon and should be completed late next year.

However, Heng Fa Chuen and other low-lying areas will have to wait at least two years before a solution becomes evident.

One expert urged the government to move faster. Piet Dircke, a specialist in the field of flood protection, said there is a time limit for undoing the damage following a disaster.

"After a flood, I usually tell city authorities 'you now have five years to move fast and make decisions'," he said, noting that within that time frame related images remain etched in public consciousness and demand for relief remains high.

After that, memories fade, so when large restoration and protection projects are proposed, people begin to think, "It wasn't so bad. Do we really need all of this?".

Dircke added that constructing and rebuilding waterfront barriers takes considerable time, especially when land must be reclaimed. In addition, there are high costs to consider. "You don't talk in years, but in decades," he said.

1 2 3 Next   >>|
Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
平原县| 明水县| 沙洋县| 龙山县| 萨嘎县| 巫山县| 宜城市| 建湖县| 凤台县| 鄂伦春自治旗| 文昌市| 建始县| 南康市| 杭锦旗| 武乡县| 金昌市| 东乡县| 岢岚县| 白玉县| 尤溪县| 香港 | 泉州市| 延寿县| 桃园市| 剑阁县| 宜春市| 博乐市| 崇信县| 金堂县| 二连浩特市| 临洮县| 辽阳县| 岑溪市| 山西省| 沅陵县| 固安县| 电白县| 崇文区| 邵武市| 比如县| 晋中市|