国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語(yǔ)Fran?ais
China
Home / China / Society

Beijing-Zhangjiakou bullet line gets powered up

By WANG KEJU | China Daily | Updated: 2019-03-13 09:40
Share
Share - WeChat
A Fuxing bullet train designed to run on the Beijing-Zhangjiakou high-speed railway exhibited in Beijing, Dec 24, 2018. [Photo by Cheng Gong/China Daily]

Construction is underway on the electrical facilities for the Beijing-Zhangjiakou high-speed railway, which will have the world's first automatically driven trains running at speeds of up to 350 kilometers per hour.

The first 1,300-meter overhead wire for the railway is now being set up, and smart devices will be enabled throughout the power supply system to ensure operational safety, China Railway Corporation said on Monday.

The new line-an important project for the 2022 Beijing Winter Olympic Games-will be the world's first intelligent, high-speed railway on which automatically operated trains reach speeds of 350 km/h, the corporation said.

The automatic operation of bullet trains in coordination with the Beidou Navigation Satellite System-the first time it has been applied to trains-was tested on a section of the Beijing-Shenyang line from July to September and passed all safety tests.

Using the system, the train can automatically start, run between stations, adjust its timing according to the schedule, accurately stop at a station, and open and close its doors, said Jiang Ming, deputy chief engineer of China Railway Signal and Communication Corporation.

The train is equipped with several thousand sensors, which allow automatic inspection at any time to ensure safe operation.

The train is also designed with an area to store snowboards, a device to secure wheelchairs and a mobile news center where passengers can watch live Olympic broadcasts.

A variety of intelligent robots will also be used at high-speed rail stations to guide passengers and help them carry their baggage, China Railway Corporation added.

The laying of track for the railway is expected to be completed in the first half of this year, and trial operations and adjustments to the line will be launched in the second half.

After the 174-kilometer line goes into operation by the end of this year, the trip between the two cities will be shortened to 50 minutes, from three hours or more at present.

The line will also connect with the Zhangjiakou-Hohhot high-speed railway, cutting travel time from Hohhot, Inner Mongolia autonomous region, to Beijing to three hours, down from nine.

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
昌平区| 石城县| 夏津县| 莱阳市| 桑植县| 商丘市| 周宁县| 明水县| 无极县| 拉萨市| 石棉县| 霍邱县| 策勒县| 衡南县| 阳泉市| 独山县| 宿州市| 新闻| 崇州市| 东宁县| 萨迦县| 浮梁县| 玛沁县| 宁陵县| 伽师县| 汝阳县| 岚皋县| 蚌埠市| 涪陵区| 城市| 濉溪县| 织金县| 津南区| 绥滨县| 台山市| 亚东县| 镶黄旗| 岳西县| 博白县| 镇巴县| 黔西|