国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語Fran?ais
China
Home / China / Innovation

Heavy lift of bridge's center arch section an engineering milestone

By ZHANG YI | chinadaily.com.cn | Updated: 2018-05-14 21:12
Share
Share - WeChat

The center arched section of the Guantang Bridge in Liuzhou, Guangxi Zhuang autonomous region, was installed early on Monday morning, the bridge’s builder said, calling it the most difficult part of the project.

The bridge spans 457 meters across the Liujiang River, according to Shanghai Civil Engineering Co, a subsidiary of China Railway Engineering Corp.

The middle arch, with a span of 262 meters, weighs 5,885 metric tons.

Lifting that much weight is equivalent to lifting 1,100 adult elephants at the same time, the heaviest lifting project in the world to date, the company said.

“However, it only took our operator a click of a mouse to finish the big project,” said Tang Jun, chief engineer of the project.

The company said the bridge is expected to be completed by the end of this year. It will serve as a major thoroughfare between downtown Liuzhou and the city’s Liudong New District.

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
久治县| 巴彦淖尔市| 英山县| 古丈县| 襄樊市| 安远县| 河西区| 镇雄县| 邓州市| 嘉荫县| 平利县| 封开县| 杭锦后旗| 塔城市| 西平县| 陈巴尔虎旗| 阜新市| 沙河市| 陆河县| 阿坝| 桑植县| 英超| 新化县| 沿河| 余江县| 鹤庆县| 通化县| 通城县| 灵武市| 公主岭市| 普格县| 循化| 侯马市| 从化市| 黔西| 余姚市| 东安县| 加查县| 阳高县| 武义县| 兴山县|