国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Global EditionASIA 中文雙語Fran?ais
China
Home / China / National affairs

Public comment sought on Beijing-Xiongan high-speed rail

By Luo Wangshu | China Daily | Updated: 2017-07-24 06:37
Share
Share - WeChat

Planners release environmental impact assessment for 100.3-kilometer corridor

An environmental impact assessment for a new high-speed railway linking Beijing and Xiongan New Area was released on Saturday. It was the first public acknowledgment that a new line will be built.

China Railway Design Corp announced the assessment on its website and is seeking public comment.

According to the notice, the Beijing-Xiongan railway will start at Liying in Beijing's Daxing district, pass through Langfang and terminate at Xiongan East Railway Station-a total length of 100.3 kilometers.

The new line will also pass through the capital's new airport, which will be about 36 km from Liying and about 64 km from Xiongan New Area. The airport is expected to open in 2019.

The existence of a railway plan was reported in April by Tianjin News. According to the report, a planning map showed two railway stations in the new area-Xiongan Railway Station and Xiongan East Railway Station. The environmental assessment covers the latter.

According to an earlier report, the Tianjin-Xiongan railway route will connect the area with Tianjin's new railway station, which is also in the planning stages.

An older rail line is already in operation. Passengers must transfer in Baoding or Tianjin to get to the Xiongan area on high-speed rail.

Since July 7, four daily high-speed railway services have been started. The journey takes one hour and 50 minutes.

The new Beijing-Xiongan line follows a different route.

Xiongan New Area is located in the center of a triangular area defined by Beijing, Tianjin and Shijiazhuang, capital of Hebei province.

Located about 100 km southwest of downtown Beijing, the new area will mostly cover Xiongxian, Rongcheng and Anxin counties in Hebei.

It will eventually encompass 2,000 square kilometers, with a population of up to 2.5 million people.

Under the area's development plan, a major transportation network should be in place in Xiongan by 2020. The area will be well connected to Beijing, Tianjin and other cities in Hebei by 2022, when the Winter Olympic Games will be held.

Xiongan New Area is intended to house the bulk of Beijing's noncapital functions, including some administrative and public institutions, company headquarters, financial institutions, higher education institutions, and science and technology units.

Top
BACK TO THE TOP
English
Copyright 1994 - . All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US
 
金山区| 贡嘎县| 梅河口市| 德清县| 仪征市| 平泉县| 西城区| 淳化县| 冷水江市| 靖安县| 离岛区| 潞西市| 瑞金市| 衡水市| 万州区| 嘉荫县| 白朗县| 宁海县| 宜川县| 将乐县| 基隆市| 平原县| 财经| 和平县| 景宁| 大余县| 平塘县| 晋城| 延津县| 临夏市| 松阳县| 河池市| 健康| 萝北县| 东方市| 阳城县| 福清市| 武胜县| 子长县| 白山市| 宜黄县|