国产热热热精品,亚洲视频久久】日韩,三级婷婷在线久久,99人妻精品视频,精品九热人人肉肉在线,AV东京热一区二区,91po在线视频观看,久久激情宗合,青青草黄色手机视频

Podcast

3,800 tons of rubbish retrieved


Updated: 2010-11-04 11:25
Large Medium Small

Get Flash Player

進(jìn)入英語(yǔ)學(xué)習(xí)論壇下載音頻   去聽(tīng)寫(xiě)專(zhuān)區(qū)一展身手

Environmental sanitation workers have collected 3,800 tons of floating garbage from the Three Gorges Dam in Central China's Hubei province, ensuring the efficient operation of the dam's generators and navigation system after engineers recently raised its water level.

Wang Yafei, an official of Zigui bureau of environmental protection and director of the cleanup operation, told China Daily on Wednesday that the cleanup operation began on Oct 26, when the dam's water level hit its designed maximum capacity of 175 meters.

The water level of the dam was raised so that it was capable of fulfilling its combined functions of flood control, power generation, navigation and water supply.

As the water level rose, large amounts of garbage - primarily tree trunks, branches and straw - appeared at the front of the dam, threatening the operation of its 26 generators.

The local government mobilized teams to remove the floating garbage, which also posed a threat to the reservoir's navigation system, said Wang.

"We have been sending 100 people in 15 boats every day to do the cleanup," he said.

Over six days, the workers salvaged more than 3,800 tons of garbage, more than 600 tons per day.

"All of the salvaged garbage will be disposed of in an environmentally friendly way. There will be no disposal in rivers and nearby places," Wang said.

Ten percent of the garbage will be used as landfill. The rest of it will be treated by the Zigui branch of the Huaxin Cement Co Ltd, he said.

"We invested more than 58 million yuan ($8.5 million) on installing waste disposal equipment, primarily for floating garbage," Huaxin manager Zhou Zhiyuan told China Daily.

According to Zhou, more than 70,000 cubic meters of floating garbage was collected from the dam from July to October.

Huaxin incinerates the garbage to generate power, which is used to produce cement.

"It is a way to develop the recycling business in the dam area," Zhou said.

The local environmental protection department said it plans to spend six months a year cleaning up the dam, from May to November.

Chen Lei, director of the key water project department under the China Three Gorges Corporation, told China Daily in August that 150,000 to 200,000 cubic meters of floating garbage is collected from the dam each year.

The China Three Gorges Corporation annually spends about 10 million yuan on clearing floating garbage. The cost of disposing of the waste is expected to hit 3 million yuan this year, he added.

China launched the Three Gorges project in 1993 with a budget equivalent to $22.5 billion.

Questions:

1. How many generators does the dam have?

2. What did the rubbish primarily consist of?

3. How much money is spent each year cleaning the dam?

Answers:

1. 26.

2. trees, branches, straw.

3. 10 million yuan.

去聽(tīng)寫(xiě)專(zhuān)區(qū)一展身手

(中國(guó)日?qǐng)?bào)網(wǎng)英語(yǔ)點(diǎn)津 Helen 編輯)

3,800 tons of rubbish retrieved

3,800 tons of rubbish retrieved

Todd Balazovic is a reporter for the Metro Section of China Daily. Born in Mineapolis Minnesota in the US, he graduated from Central Michigan University and has worked for the China Daily for one year.

 

社旗县| 大城县| 崇仁县| 信宜市| 明溪县| 高碑店市| 金平| 台江县| 巩义市| 霸州市| 南江县| 濉溪县| 乌苏市| 珠海市| 西盟| 江永县| 北京市| 遂溪县| 巍山| 庆云县| 库尔勒市| 潮州市| 涿鹿县| 延津县| 迭部县| 库伦旗| 韶山市| 舟曲县| 长海县| 通许县| 册亨县| 顺平县| 天长市| 夏邑县| 遵义县| 丰台区| 方正县| 鹰潭市| 松滋市| 云浮市| 潮安县|